Cape Fear Valley Health Histology, Cytology, and Linac

  • Scope: Histology, Cytology, and Linear Accelerator Renovation
  • Total Project Cost: $1.9 Million
  • Type of Project: Medical Facility
  • Length of Project: 4 Months

Project consisted of three areas on the first floor of the facility comprising an area of approximately 843 SF for the Histology Lab, 714 SF for the Cytology Lab & 1,288 SF for the Linear Accelerator #5. The scope of work included but was not limited to: selective demolition, flooring, gypsum board partitions, doors & frames & hardware, acoustical ceiling systems, mechanical, plumbing, electrical, fire protection and fire & life safety systems and structural steel modifications.